Pipeline · Interconnection Queued
Section LDS Solar + BESS
80 MW solar with 80 MW / 320 MWh storage on about 515 acres in Larimer County, Colorado, beside the Rawhide Power Plant. Partly on Colorado State Land Board lease; interconnection filed to Platte River Power Authority.
Larimer County, CO Platte River Power Authority WECC
- Solar MW-AC
- 80
- BESS MW
- 80
- BESS MWh
- 320
- Status as of
- July 17, 2026
Site
About 515 acres in Larimer County, Colorado, adjacent to the Rawhide Power Plant and its existing transmission. Part of the site is under a Colorado State Land Board lease.
Interconnection
Interconnection filed to Platte River Power Authority (PRPA) in the WECC footprint. Siting next to Rawhide puts the project close to established high-voltage transmission.
Permitting
Permitting underway with Larimer County.
Status
- About 515-acre site adjacent to the Rawhide Power Plant and its transmission
- 80 MW solar paired with 80 MW / 320 MWh (4-hour) BESS
- Partly under Colorado State Land Board lease
- Interconnection filed to Platte River Power Authority
- Permitting in progress