Pipeline · Interconnection Queued

Section LDS Solar + BESS

80 MW solar with 80 MW / 320 MWh storage on about 515 acres in Larimer County, Colorado, beside the Rawhide Power Plant. Partly on Colorado State Land Board lease; interconnection filed to Platte River Power Authority.

Larimer County, CO Platte River Power Authority WECC
Solar MW-AC
80
BESS MW
80
BESS MWh
320
Status as of
July 17, 2026

Site

About 515 acres in Larimer County, Colorado, adjacent to the Rawhide Power Plant and its existing transmission. Part of the site is under a Colorado State Land Board lease.

Interconnection

Interconnection filed to Platte River Power Authority (PRPA) in the WECC footprint. Siting next to Rawhide puts the project close to established high-voltage transmission.

Permitting

Permitting underway with Larimer County.